height of dam meaning in Chinese
坝高
Examples
- The effect of groyne length and layout on water surface is analyzed in the paper . based on the results of simulation and experiment , the local energy loss of the flow due to the groyne is studied . consequently the surface variation and height of damming are also analyzed
论文分析了丁坝长度与布置对水面线的影响,根据流场、紊动场模拟结果和实验结果研abstract究丁坝造成的水流局部能量损失,并对水面变化和丁坝奎水高度进行了分析。 - Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province . the height of dam is 292 m , and its installed capacity is 4 , 200 , 000 kilowatt , so it ' s a large - scale water - power engineering . the height of excavation reach to 80 m . so it is sure , that the excavation will influence on the stability of the slop . the stability of the slop is the necessary condition to assure the trouble - free operation of the station
云南省澜沧江小湾水电站位于云南省南涧县和风庆县的交界处,最大拟建坝高292m ,装机容量420万千瓦,属特大型水电工程。左岸砂石系统边坡位于澜沧江左岸8 ~ #山梁,主体开挖高度达80m ,开挖对边坡的稳定性产生很大的影响。该边坡的稳定性对水电工程建设的顺利进行。 - The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam , the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam , the maximal and minimal stress distribution map in dam abutment along with the height of dam , the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations , and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam
本文研究成果可给出坝体的拱冠梁剖面和坝体中心纵剖面的温度等值线图、拱冠梁剖面和坝体上下游面应力等值线图、坝肩最大最小应力沿坝高的分布曲线、不同高程处典型点的最大最小应力值表以及不同高程处最大最小应力值表等成果,为碾压混凝土拱坝的设计和施工中采取相应的温控措施提供了参考依据。